Installation requirements and precautions for calcium hydroxide production line
In order to ensure the stable operation of the calcium hydroxide production line and ensure normal production, it is inseparable from the correct installation. For the installation requirements and precautions of the calcium hydroxide production line, the calcium hydroxide production line manufacturer gave us a detailed introduction. One Get up and find out!
Calcium hydroxide production line installation requirements
1. Device positioning
According to the layout of the entire production line and the axis or edge line and elevation line of the building, the installation reference line is delineated. Equipment that is connected, connected or arranged with each other should release a common installation reference line; according to needs, the target board or reference point can be embedded, and the specific basic position line and elevation line can be set.
2. Overall inspection
After installation, check the overall equipment, check the coordinate position of the foundation, the elevations of different planes, the dimensions of the plane, the dimensions of the plane on the boss, the dimensions of the cavity, the level of the plane, the vertical degree of the foundation, and the pre-buried ground. The elevation and center distance of the anchor bolts, the center position, depth and vertical degree of the hole wall of the embedded anchor bolt hole, the elevation and center position of the anchor plate of the embedded movable anchor bolt, the grooved anchor plate and the threaded anchor plate. level, etc.
3. Preload test
The preload test is a preventive measure taken to prevent the installation of heavy equipment from unqualified installation due to uneven subsidence of the foundation after installation. The preload of the test is not less than the sum of the forces acting on the foundation of the equipment under full load operation. The points shall not be affected by the settlement of the foundation, and the observation points shall be no less than four points evenly distributed around the foundation. Observations should be timed and should be until the foundation is substantially stable.
4. Fixed equipment
In addition to movable equipment, other heavy, high-speed, high-vibration mechanical equipment needs to be firmly fixed on the basis of the equipment. If it is not fixed, accidents may occur. Assemble again.
Precautions for the use of calcium hydroxide production line
1. Regular inspection: The calcium hydroxide production line should maintain the equipment during use, and regularly inspect all parts of the production line. If the parts are found to be worn, they should be replaced to avoid affecting the normal operation.
2. Handle abnormal situations in a timely manner: If an abnormal situation is found in the operation of the calcium hydroxide production line, it must be stopped immediately, and the abnormal situation should be checked. After the fault is solved, the production can be continued to avoid unnecessary losses.
After the above introduction, it can be seen that the installation requirements of the calcium hydroxide production line include equipment positioning, overall inspection, pre-loading test, fixed equipment, etc. Handle abnormal situations, so as to effectively reduce the failure rate of equipment and improve the service life of the production line.